12 Jun Electric and Natural Gas savings for Cariboo Memorial Complex in Williams Lake, BC
The Facility Management from the Cariboo Memorial Complex in Williams Lake, BC had analysed their utility consumption over a 5 month period and compared it to the previous 5 years during the same period. PREVIOUS HYDRO CONSUMPTION AVERAGE 2009-2013: 711,587 KWH PREVIOUS NATURAL GAS CONSUMPTION AVERAGE 2009-2013: 1898.0 GJ 2014 WITH...